As viewed with the determine underneath, continuous auger is utilized to drill the borehole, lift up drilled soil, and pour concrete while the auger is moved up. Because of this, the borehole won't want casing or hydrostatic tension to prevent damage to the borehole wall. In situations the place it https://castinsitupiles65284.vidublog.com/31705088/the-cast-in-situ-piles-in-bangladesh-diaries